º£½ÇÊÓÆµ

Oops.

Our website is temporarily unavailable in your location.

We are working hard to get it back online.

PRIVACY
Tech

Lincoln Cathedral's stunning NHS light-up courtesy of Grimsby electrical contractors' £1.6m project

Entire new system just installed by G-Tech to make county's global icon shine brighter than ever before

Lincoln Cathedral is to shine blue in support of the NHS.

Lincoln Cathedral’s glowing tribute to NHS workers battling Covid-19 was courtesy of a £1.6 million project from a Grimsby-area electrical contractor.

Lit up bright blue as frontline workers were clapped nationwide, the county’s famous landmark has just been completely overhauled by Humberston specialist G-Tech.

It was quite literally seen in a new light, with images broadcast globally to show the love for doctors, nurses, care workers and vital support staff.

As well as the cathedral’s refreshed visual glorification, the North East Lincolnshire team also connected up a visitor centre.

Simon Furneaux, director, said: “It is the most prestigious job we have done. We do a lot of industrial work, where we stand back and acknowledge a job done well, but if it is a factory, very few people see it. This is something very different.

“We have redone all the lighting, externally, from scratch, taken out all the old stuff, and now it is all done architecturally. We have been putting fittings in at 200ft high, at the top of the towers. While we have been doing that we have refurbished the deanery and the new exhibition centre.

Lincoln Cathedral is lit up in blue in a gesture of thanks to the hardworking NHS staff who are trying to battle coronavirus. A national salute for the frontline healthcare heroes was held on Thursday evening.(Image: PA)

“It has been quite a spectacular job, some of the lights are worth a lot of money, and we’ve put miles and miles of cabling in. It is an amazing place, a real eye-opener. We have been in places people would never see – it is an amazing building.”

G-Tech, on Wilton Road Industrial Estate, started a year ago, with the initial switch-on in November - a project brought in three months early.