º£½ÇÊÓÆµ

Oops.

Our website is temporarily unavailable in your location.

We are working hard to get it back online.

PRIVACY
Manufacturing

Prime Minister's approval for 'world class' skills site built by expanding East Yorkshire business

It will offer development opportunities for utility firm's 7,000 staff and 500 Kickstart Scheme recruits

Prime Minister Boris Johnson met apprentices and Kickstart trainees during a tour of the facilities built by modular construction specialist Integra Buildings.(Image: Severn Trent Water)

A technical training site for Severn Trent Water and officially opened by Prime Minister Boris Johnson has been delivered by East Yorkshire’s Integra Buildings.

One of the biggest contracts it has ever served, the team used cutting-edge modular construction methods to deliver the 2,100 sq m facility.

It comes in a month that saw it receive planning consent for a major expansion of its own. Integra is developing six acres of land next to its site in Paull, with work to start later this year.

The Severn Trent Academy in Coventry represents a £10 million investment in skills and training. The versatile facilities provide a variety of traditional and experimental training environments, from hands-on areas designed to replicate work in the field, to use of the latest technologies in virtual reality and network simulation computer modelling.

The energy-efficient building also houses an extensive suite of stylish rooms and breakout areas for hosting conferences and educational events.

Mr Johnson was drawn to it as the utility provider is a key part of the Kickstart scheme, describing the set-up as “world class”.

The Severn Trent Academy delivered by Integra Buildings provides a purpose-built centre of excellence for technical training.(Image: Severn Trent Water)

Integra completed the development in a year from the design stage to handing over the keys, despite Covid-19 challenges. It is described as a prime example of how modern modular techniques are transforming the construction sector by delivering major projects faster and more efficiently than traditional methods, without compromising on quality.

Managing director Gary Parker said: “We’re delighted that the Prime Minister has praised the new academy, which looks superb inside and out. Working closely with Severn Trent, our team has delivered a first-class training environment with cutting-edge facilities.