º£½ÇÊÓÆµ

Oops.

Our website is temporarily unavailable in your location.

We are working hard to get it back online.

PRIVACY
Manufacturing

Plans submitted for £90m Pensana magnet metals site to feed electric vehicles and wind turbines

100 jobs to be created if facility is given the go-ahead for Humber strategic location

A visualisation of the Pensana rare earths processing plant at Saltend Chemicals Park. (Image: Pensana Plc)

Plans for a complex chemical engineering plant to kickstart a magnet metal supply chain from the Humber Bank have been submitted.

Pensana Rare Earth’s proposed processing facility at Saltend is valued at more than £90 million, and could create 100 jobs once operating.

The oxide separation site would feed in mined materials from the company’s African explorations, with the end products produced by other businesses going into wind turbines and electric vehicles.

Engineering giant Wood Group is designing the facility, which would become one of the world’s largest producers of rare earth oxides.

Pensana’s chairman, Paul Atherley, said: “We have been delighted with the enthusiastic support from a broad range of stakeholders for this proposed investment, which will create high value manufacturing jobs in the Humber region and will be an important step in establishing the world’s first sustainable mine to magnet metal supply chain in the º£½ÇÊÓÆµ.

"The plug and play services provided by the PX Group at the world-class Saltend Chemicals Park have substantially reduced the capital cost of the proposed facility, allowing us to focus on the operational aspects of the investment and providing scope for our longer-term ambitions.

Paul Atherley, chairman of Pensana.(Image: Pensana)

“We look forward to working with local stakeholders on establishing the approvals for this investment in high value manufacturing in the º£½ÇÊÓÆµ.”

The London Stock Exchange-listed firm announced the potential investment last month, with the Humber preferred to sites in Merseyside, Teesside and Germany. As highlighted, the gas, electricity and chemical availability and connectivity at Saltend was key.