º£½ÇÊÓÆµ

Oops.

Our website is temporarily unavailable in your location.

We are working hard to get it back online.

PRIVACY
Manufacturing

Huge heavy engineering base geared up for high level growth

Engie Fabricom invests in 13,615 acre Immingham site

Engie Fabricom's Immingham manufacturing and construction facility spans 13,615 acres, and can deal with major projects.(Image: Grimsby Telegraph)

Significant investment has been channelled into a huge engineering base at Immingham as it is geared up to play a key role in high level growth plans.

Engie Fabricom’s 13,615-acre manufacturing and construction facility has had enviable transportation links to the neighbouring port improved, as well as machinery advances.

The road rail crossing work has significantly enhanced the access links to both the rail and docking areas it has, with a large investment into its state-of-the-art welding fume extraction facilities that meet the stringent new rulings of the Health and Safety Executive.

The base, off Middleplatt Road, is the largest of five sites operated in the º£½ÇÊÓÆµ by the Grimsby-headquartered firm.

Big kit: Engie Fabricom's Immingham manufacturing and construction facility spans 13,615 acres, and can deal with major projects.(Image: Engie Fabricom)

Upgrades to the site form part of the company’s ambitious growth plans which have recently seen the introduction of a more streamlined organisational structure as it strives to hit a 100 per cent increase in turnover by 2022.
It closed off 2017 with revenues of £54 million, employing 274 people.

Richard Webster, chief executive, said: “It is important for the business to continually invest in our facilities and be at the very forefront in service delivery. It is absolutely imperative that we continue to ensure all systems are well above HSE requirements and operate as efficiently as possible.

“Our manufacturing and construction centre is in an absolute ideal location – which is very much a selling point for our clients - and through enhancing our already robust transport infrastructure at this site – our operations will run even more swiftly.

“We are delighted that we have seen significant growth in enquiries and possess a very healthy order book for the next year. We will continue to ensure the very highest levels of service will be delivered.”