º£½ÇÊÓÆµ

Oops.

Our website is temporarily unavailable in your location.

We are working hard to get it back online.

PRIVACY
Economic Development

How two upgraded Greater Manchester train stations could look as Transpennine Route Upgrade continues

Network Rail plans to relocate Mossley station and upgrade Greenfield station in Greater Manchester

A CGI of how the new Greenfield Station could look(Image: Network Rail)

Fresh visuals have been unveiled showcasing how two Greater Manchester stations could look after major redevelopments as part of a rail upgrade scheme.

Mossley Station is due to be relocated and Greenfield Station enhanced as part of the Transpennine Route Upgrade (TRU) and its substantial improvements along the line between Stalybridge and Diggle in Saddleworth. The proposed developments include bridge modifications for overhead line equipment and comprehensive electrification to allow for swifter, greener, and more dependable train services.

Network Rail also plans better accessibility and extended platforms at both stations. It will launch a public consultation from September 16 to October 25 to provide an opportunity for community input, reports .

Mark Ashton, TRU Sponsor, said: "The TRU Stalybridge to Diggle (Saddleworth) public consultation is the opportunity for the public to hear about our exciting plans for the area, which includes improved, more accessible stations at Mossley and Greenfield for the first time in the route's history.

"We want to bring the people of Stalybridge, Heyrod, Mossley, Greenfield, Uppermill and Diggle with us on this journey. I urge the local community and businesses to look at our plans through our virtual consultation room or at the in-person events and let us know their thoughts through our feedback form."

Three in-person drop-in events are scheduled, where attendees can review the plans and speak to TRU representatives.

Mossley station could be relocated 300 metres northeast of its current location, towards Greenfield, if proposed plans are approved. The move would allow for an improved and more accessible station, complete with a new footbridge and lifts.

In addition to enhanced accessibility, platform extensions are planned for both Mossley and Greenfield stations. This would provide space for longer services, resulting in more seating availability for passengers.